Williams Family

June 25th, 2013

Another Great Solar Panel buy a GREAT Technician.

Connectiions made into the compressor.

The Roofing Company is Putting the Final Touches on Installing the Panel rack to the roof #2

The Roofing Company is Putting the Final Touches on Installing the Panel rack to the roof

The Solar Panels are Kept covered until the system has been correctly charged.

The Technician is setting up the refrigerant track the the lines from the solar panel will be hidden in. Picture #2

The Technician is setting up the refrigerant track the the lines from the solar panel will be hidden in. Picture #3

The Technician is setting up the refrigerant track the the lines from the solar panel will be hidden in. Picture #4

The Technician is setting up the refrigerant track the the lines from the solar panel will be hidden in.

The Technicians are making the final adjustments to the Solar Panel.

These are the connecion valves for the solar panel  at the Heat Pump.

This is a finished View of the Panel before the safety walk boards are removed.

Warren Williams Solar Job 106

Warren Williams Solar Job 226

Comments are closed.